Article
Publication date: 6 June 2023

Oluwaseun Akindele, Saheed Ajayi, Adekunle S. Oyegoke, Hafiz A. Alaka and Temitope Omotayo

Notwithstanding the Geographical Information System (GIS) being a fast-emerging green area of a digital revolution, the available studies focus on different subject areas of…

Abstract

Purpose

Notwithstanding the Geographical Information System (GIS) being a fast-emerging green area of a digital revolution, the available studies focus on different subject areas of application in the construction industry, with no study that clarifies its knowledge strands. Hence, this systematic review analyses GIS core area of application, its system integration patterns, challenges and future directions in the construction industry.

Design/methodology/approach

A systematic review approach was employed, using the Preferred Reporting Items for Systematic Reviews and Meta-Analyses (PRISMA) checklist. A total of 60 articles published between 2011 and 2022 were identified, thoroughly reviewed and analysed using thematic analysis.

Findings

The analysis revealed spatial planning and design, construction-task tracking, defect detection and safety monitoring as its four main application-based areas. The findings showed that the adoption of GIS technology is rapidly expanding and being utilised more in building projects to visual-track construction activities. The review discovered an integrated pattern involving data flow from a device and window-form application to GIS, the pathways to data exchange between platforms to platforms, where ArcGIS is the most used software. Furthermore, the study highlighted the lack of interoperability between heterogeneous systems as the crux impediment to adopting GIS in the built environment.

Originality/value

The research provides a deep insight into possible areas where GIS is adopted in the construction industry, identifying areas of extensive and limited application coverage over a decade. Besides, it demystifies possible pathways for future integration opportunities of GIS with other emerging technologies within the construction industry.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Open Access
Article
Publication date: 12 March 2018

Hafiz A. Alaka, Lukumon O. Oyedele, Hakeem A. Owolabi, Muhammad Bilal, Saheed O. Ajayi and Olugbenga O. Akinade

This study explored use of big data analytics (BDA) to analyse data of a large number of construction firms to develop a construction business failure prediction model (CB-FPM)…

1015

Abstract

This study explored use of big data analytics (BDA) to analyse data of a large number of construction firms to develop a construction business failure prediction model (CB-FPM). Careful analysis of literature revealed financial ratios as the best form of variable for this problem. Because of MapReduce’s unsuitability for iteration problems involved in developing CB-FPMs, various BDA initiatives for iteration problems were identified. A BDA framework for developing CB-FPM was proposed. It was validated by using 150,000 datacells of 30,000 construction firms, artificial neural network, Amazon Elastic Compute Cloud, Apache Spark and the R software. The BDA CB-FPM was developed in eight seconds while the same process without BDA was aborted after nine hours without success. This shows the issue of not wanting to use large dataset to develop CB-FPM due to tedious duration is resolvable by applying BDA technique. The BDA CB-FPM largely outperformed an ordinary CB-FPM developed with a dataset of 200 construction firms, proving that use of larger sample size with the aid of BDA, leads to better performing CB-FPMs. The high financial and social cost associated with misclassifications (i.e. model error) thus makes adoption of BDA CB-FPMs very important for, among others, financiers, clients and policy makers.

Details

Applied Computing and Informatics, vol. 16 no. 1/2
Type: Research Article
ISSN: 2634-1964

Keywords

Article
Publication date: 8 July 2021

Saheed O. Ajayi, Farouq Oyebiyi and Hafiz A. Alaka

To foster effective implementation of building information modelling (BIM), it is guided by standards and protocols that require files naming in a format, containing a string of…

1126

Abstract

Purpose

To foster effective implementation of building information modelling (BIM), it is guided by standards and protocols that require files naming in a format, containing a string of letters and digits in a tightly defined manner, which is perceived to be time-consuming, error-prone and serves as a barrier to BIM adoption. This paper aims to present a BIM-based plug-in solution (Auto-BIMName) that facilitates automated naming in compliance with BIM standards.

Design/methodology/approach

The Auto-BIMName portal has an information management system (IMS) for generating a master information delivery plan (MIDP), which serves as pre-requisites to effective file naming. Once the naming schema is implemented through text input controls for a project name, volume, level and number, the Revit plugin communicates with its IMS to fetch the name string or concatenate the string in line with the ISO 19650 convention, where the IMS is unused. The system was validated through a simulated collaborative project.

Findings

System testing and evaluation confirmed that the Auto-BIMName will ease the process of file naming, thereby facilitating collaboration efficiency, naming consistency across project teams and lifecycle stages, ease of file naming, time-saving and inducement for BIM implementation, etc. By linking information from MIDP in the BIM execution plan, the platform enhanced information management processes and improved coordination across project teams and lifecycle stages.

Originality/value

Apart from demonstrating how the automated naming platform enhances project performance, information management and coordination, the paper provides a practical demonstration of how the construction industry will benefit from enhanced digitalisation and process automation.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 1
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 18 July 2016

Saheed O Ajayi, Lukumon O. Oyedele, Kabir O Kadiri, Olugbenga O Akinade, Muhammad Bilal, Hakeem A Owolabi and Hafiz A Alaka

Competency-based measure is increasingly evident as an effective approach to tailoring training and development for organisational change and development. With design stage widely…

1440

Abstract

Purpose

Competency-based measure is increasingly evident as an effective approach to tailoring training and development for organisational change and development. With design stage widely reckoned as being decisive for construction waste minimisation, the purpose of this paper is to identify designers’ competencies for designing out waste.

Design/methodology/approach

Due to paucity of research into competency for construction waste mitigation, this study corroborates verbal protocol analyses (VPA) with phenomenological research.

Findings

Combining findings from the two methodological approaches, competencies for designing out waste are grouped into five categories, three of which are largely task related and two being contextual competencies. The study suggests that design task proficiency, low waste design skills and construction-related knowledge are indispensable task competencies, while behavioural competence and inter-professional collaborative abilities are requisite contextual competencies for designing out waste. In concurrence with task-contextual theory of job performance, personality variables and cognitive abilities are found to influence one another. This suggests that both task and contextual competencies are not only important, they are less mutually exclusive with respect to designing out waste.

Practical implications

This study implies that apart from commitment and dedication of designers to waste minimisation, design and firm practices are expected to be adapted to the industry’s standard.

Originality/value

Basis for training needs of design professionals as well as redeployment criterion are further elaborated in the paper. By enhancing competencies identified in this study, construction waste would not only be significantly designed out, adequate cost saving could be made as a result of waste reduction.

Details

Engineering, Construction and Architectural Management, vol. 23 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 February 2024

Hakeem A. Owolabi, Azeez A. Oyedele, Lukumon Oyedele, Hafiz Alaka, Oladimeji Olawale, Oluseyi Aju, Lukman Akanbi and Sikiru Ganiyu

Despite an enormous body of literature on conflict management, intra-group conflicts vis-à-vis team performance, there is currently no study investigating the conflict prevention…

Abstract

Purpose

Despite an enormous body of literature on conflict management, intra-group conflicts vis-à-vis team performance, there is currently no study investigating the conflict prevention approach to handling innovation-induced conflicts that may hinder smooth implementation of big data technology in project teams.

Design/methodology/approach

This study uses constructs from conflict theory, and team power relations to develop an explanatory framework. The study proceeded to formulate theoretical hypotheses from task-conflict, process-conflict, relationship and team power conflict. The hypotheses were tested using Partial Least Square Structural Equation Model (PLS-SEM) to understand key preventive measures that can encourage conflict prevention in project teams when implementing big data technology.

Findings

Results from the structural model validated six out of seven theoretical hypotheses and identified Relationship Conflict Prevention as the most important factor for promoting smooth implementation of Big Data Analytics technology in project teams. This is followed by power-conflict prevention, prevention of task disputes and prevention of Process conflicts respectively. Results also show that relationship and power conflicts interact on the one hand, while task and relationship conflict prevention also interact on the other hand, thus, suggesting the prevention of one of the conflicts could minimise the outbreak of the other.

Research limitations/implications

The study has been conducted within the context of big data adoption in a project-based work environment and the need to prevent innovation-induced conflicts in teams. Similarly, the research participants examined are stakeholders within UK projected-based organisations.

Practical implications

The study urges organisations wishing to embrace big data innovation to evolve a multipronged approach for facilitating smooth implementation through prevention of conflicts among project frontlines. This study urges organisations to anticipate both subtle and overt frictions that can undermine relationships and team dynamics, effective task performance, derail processes and create unhealthy rivalry that undermines cooperation and collaboration in the team.

Social implications

The study also addresses the uncertainty and disruption that big data technology presents to employees in teams and explore conflict prevention measure which can be used to mitigate such in project teams.

Originality/value

The study proposes a Structural Model for establishing conflict prevention strategies in project teams through a multidimensional framework that combines constructs like team power conflict, process, relationship and task conflicts; to encourage Big Data implementation.

Details

Information Technology & People, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0959-3845

Keywords

Open Access
Article
Publication date: 13 October 2022

Christian Nnaemeka Egwim, Hafiz Alaka, Eren Demir, Habeeb Balogun and Saheed Ajayi

This study aims to develop a comprehensive conceptual framework that serves as a foundation for identifying most critical delay risk drivers for Building Information Modelling…

1695

Abstract

Purpose

This study aims to develop a comprehensive conceptual framework that serves as a foundation for identifying most critical delay risk drivers for Building Information Modelling (BIM)-based construction projects.

Design/methodology/approach

A systematic review was conducted using Preferred Reporting Items for Systematic Reviews and Meta-Analyses (PRISMA) to identify key delay risk drivers in BIM-based construction projects that have significant impact on the performance of delay risk predictive modelling techniques.

Findings

The results show that contractor related driver and external related driver are the most important delay driver categories to be considered when developing delay risk predictive models for BIM-based construction projects.

Originality/value

This study contributes to the body of knowledge by filling the gap in lack of a conceptual framework for selecting key delay risk drivers for BIM-based construction projects, which has hampered scientific progress toward development of extremely effective delay risk predictive models for BIM-based construction projects. Furthermore, this study's analyses further confirmed a positive effect of BIM on construction project delay.

Details

Frontiers in Engineering and Built Environment, vol. 3 no. 1
Type: Research Article
ISSN: 2634-2499

Keywords

Article
Publication date: 12 December 2022

Godoyon Ebenezer Wusu, Hafiz Alaka, Wasiu Yusuf, Iofis Mporas, Luqman Toriola-Coker and Raphael Oseghale

Several factors influence OSC adoption, but extant literature did not articulate the dominant barriers or drivers influencing adoption. Therefore, this research has not only…

Abstract

Purpose

Several factors influence OSC adoption, but extant literature did not articulate the dominant barriers or drivers influencing adoption. Therefore, this research has not only ventured into analyzing the core influencing factors but has also employed one of the best-known predictive means, Machine Learning, to identify the most influencing OSC adoption factors.

Design/methodology/approach

The research approach is deductive in nature, focusing on finding out the most critical factors through literature review and reinforcing — the factors through a 5- point Likert scale survey questionnaire. The responses received were tested for reliability before being run through Machine Learning algorithms to determine the most influencing OSC factors within the Nigerian Construction Industry (NCI).

Findings

The research outcome identifies seven (7) best-performing algorithms for predicting OSC adoption: Decision Tree, Random Forest, K-Nearest Neighbour, Extra-Trees, AdaBoost, Support Vector Machine and Artificial Neural Network. It also reported finance, awareness, use of Building Information Modeling (BIM) and belief in OSC as the main influencing factors.

Research limitations/implications

Data were primarily collected among the NCI professionals/workers and the whole exercise was Nigeria region-based. The research outcome, however, provides a foundation for OSC adoption potential within Nigeria, Africa and beyond.

Practical implications

The research concluded that with detailed attention paid to the identified factors, OSC usage could find its footing in Nigeria and, consequently, Africa. The models can also serve as a template for other regions where OSC adoption is being considered.

Originality/value

The research establishes the most effective algorithms for the prediction of OSC adoption possibilities as well as critical influencing factors to successfully adopting OSC within the NCI as a means to surmount its housing shortage.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 12 August 2022

Muhammad Azeem Abbas, Saheed O. Ajayi, Adekunle Sabitu Oyegoke and Hafiz Alaka

Master information delivery plan (MIDP) is a key requirement for building information modelling (BIM) execution plan (BEP) that enlists all information deliverables in BIM-based…

2563

Abstract

Purpose

Master information delivery plan (MIDP) is a key requirement for building information modelling (BIM) execution plan (BEP) that enlists all information deliverables in BIM-based project, containing information about what would be prepared, when, by who, as well as the procedures and protocols to be used. In a well-conceived BEP, the MIDP facilitates collaboration among stakeholders. However, current approaches to generating MIDP are manual, making it tedious, error-prone and inconsistent, thereby limiting some expected benefits of BIM implementation. The purpose of this study is to automate the MIDP and demonstrate a collaborative BIM system that overcomes the problems associated with the traditional approach.

Design/methodology/approach

A BIM cloud-based system (named Auto-BIMApp) involving naming that automated MIDP generation is presented. A participatory action research methodology involving academia and industry stakeholders is followed to design and validate the Auto-BIMApp.

Findings

A mixed-method experiment is conducted to compare the proposed automated generation of MIDP using Auto-BIMApp with the traditional practice of using spreadsheets. The quantitative results show over 500% increased work efficiency, with improved and error-free collaboration among team members through Auto-BIMApp. Moreover, the responses from the participants using Auto-BIMApp during the experiment shows positive feedback in term of ease of use and automated functionalities of the Auto-BIMApp.

Originality/value

The replacement of traditional practices to a complete automated collaborative system for the generation of MIDP, with substantial productivity improvement, brings novelty to the present research. The Auto-BIMApp involve multidimensional information, multiple platforms, multiple types and levels of users, and generates three different representations of MIDP.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 26 September 2022

Christian Nnaemeka Egwim, Hafiz Alaka, Oluwapelumi Oluwaseun Egunjobi, Alvaro Gomes and Iosif Mporas

This study aims to compare and evaluate the application of commonly used machine learning (ML) algorithms used to develop models for assessing energy efficiency of buildings.

Abstract

Purpose

This study aims to compare and evaluate the application of commonly used machine learning (ML) algorithms used to develop models for assessing energy efficiency of buildings.

Design/methodology/approach

This study foremostly combined building energy efficiency ratings from several data sources and used them to create predictive models using a variety of ML methods. Secondly, to test the hypothesis of ensemble techniques, this study designed a hybrid stacking ensemble approach based on the best performing bagging and boosting ensemble methods generated from its predictive analytics.

Findings

Based on performance evaluation metrics scores, the extra trees model was shown to be the best predictive model. More importantly, this study demonstrated that the cumulative result of ensemble ML algorithms is usually always better in terms of predicted accuracy than a single method. Finally, it was discovered that stacking is a superior ensemble approach for analysing building energy efficiency than bagging and boosting.

Research limitations/implications

While the proposed contemporary method of analysis is assumed to be applicable in assessing energy efficiency of buildings within the sector, the unique data transformation used in this study may not, as typical of any data driven model, be transferable to the data from other regions other than the UK.

Practical implications

This study aids in the initial selection of appropriate and high-performing ML algorithms for future analysis. This study also assists building managers, residents, government agencies and other stakeholders in better understanding contributing factors and making better decisions about building energy performance. Furthermore, this study will assist the general public in proactively identifying buildings with high energy demands, potentially lowering energy costs by promoting avoidance behaviour and assisting government agencies in making informed decisions about energy tariffs when this novel model is integrated into an energy monitoring system.

Originality/value

This study fills a gap in the lack of a reason for selecting appropriate ML algorithms for assessing building energy efficiency. More importantly, this study demonstrated that the cumulative result of ensemble ML algorithms is usually always better in terms of predicted accuracy than a single method.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 22 December 2022

Saheed O. Ajayi, Natasha Lister, Jamiu Adetayo Dauda, Adekunle Oyegoke and Hafiz Alaka

Health and safety is an important issue in workplaces, and despite safety procedures becoming more strict, serious accidents are still happening within the UK construction sector…

Abstract

Purpose

Health and safety is an important issue in workplaces, and despite safety procedures becoming more strict, serious accidents are still happening within the UK construction sector. This demonstrates poor performance in the implementation of safety procedures on construction sites. One of the key challenges is the unwillingness of the site workforce, especially the subcontracted operatives, to adhere to safety provisions on construction sites. As such, this study investigates the strategies for enhancing safe behaviour amongst subcontracted operatives in the UK construction industry.

Design/methodology/approach

The study used exploratory sequential mixed method research, involving interviews and questionnaires as means of data collection, and thematic analysis, reliability analysis and exploratory factor analysis as methods of data analysis.

Findings

The study suggests that various carrot and stick measures are expected to be put in place as part of the strategies for enhancing safe behaviour amongst subcontracted operatives. These include adequate enforcement of safety practices by the management, operative engagement and motivation, commendation and rewards, site safety targets, leadership style and motivation.

Originality/value

Application of the suggested measures could enhance safety on construction sites, as it provides practical measures and solutions for inculcating safety behaviours amongst the site operatives who are most likely to be the victims of site accidents.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords